A risk assessment is a structured way to find what could cause harm, judge how likely and how serious it is and decide what to do about it. A risk register is the living record of those risks and the actions against them. This guide shows how to carry out a risk assessment step by step and how to keep a risk register that people use.

What is a risk assessment?

A risk assessment is a systematic process for identifying hazards, evaluating the risk each one presents and deciding on controls. Its purpose is to prevent harm by acting before something goes wrong. Many laws require employers to carry out risk assessments for work activities, so check the rules that apply to each site.

A hazard is something with the potential to cause harm. Risk is the likelihood of that harm combined with how severe it would be. A risk assessment looks at both.

How to do a risk assessment: five steps

Step 1: Identify the hazards

Walk the workplace and look at the tasks, not just the locations. Talk to the people who do the work, because they know where things go wrong. Review incident and near miss records, equipment manuals and safety data sheets. Consider health hazards such as noise, chemicals and stress, as well as safety hazards.

Step 2: Decide who could be harmed and how

List the groups at risk, such as employees, contractors, visitors, members of the public, young workers, new starters and anyone with specific needs. Describe the type of harm, for example a fall from height or long-term exposure to dust.

Step 3: Evaluate the risk and decide on controls

Rate each risk using likelihood and severity. Then choose controls, starting with the most effective option in the hierarchy of controls.

Likelihood / severity Minor Moderate Major Fatal
Rare Low Low Medium Medium
Possible Low Medium High High
Likely Medium High High Very high
Almost certain Medium High Very high Very high

This is an example matrix. Organizations design their own scales, so define each term clearly and use the same matrix across the business. Otherwise two people will rate the same risk differently.

  • Elimination: remove the hazard
  • Substitution: replace it with something safer
  • Engineering controls: guards, ventilation and barriers
  • Administrative controls: procedures, training and signage
  • PPE: protective equipment as the last line of defense

Step 4: Record the findings and act

Write down the hazards, the people at risk, the controls in place, the remaining risk and any further actions. Give every action an owner and a due date. A finding without an owner rarely gets fixed.

Step 5: Review and update

Review the assessment on a set schedule and whenever something changes, such as new equipment, a new process, a change in staffing, an incident or a near miss. Check that the controls work in practice, not only on paper.

Types of risk assessment

Type When to use it Example
Baseline or general To cover everyday work activities across a site Office, warehouse or plant-wide assessment
Task-based For a specific job or process Replacing a conveyor belt
Dynamic When conditions change on the spot Frontline check before starting work
Specialist When a topic needs expert knowledge Chemical exposure, noise or manual handling

Common risk assessment mistakes

  • Copying a generic template without adapting it to the site
  • Assessing the location but ignoring the tasks
  • Leaving out the people who do the work
  • Using vague scales so scores are inconsistent
  • Recording hazards but not assigning actions
  • Filing the assessment and never reviewing it

Digital tools can help teams keep assessments consistent and track actions. Ideagen risk assessment software gives teams a structured way to record assessments, assign actions and review them. People still need to make the judgment calls about what is acceptable.

What is a risk register?

A risk register is a central record of identified risks, their ratings, their owners and the actions to manage them. A risk assessment finds and evaluates risk at a point in time. The register keeps the results in one place so the organization can monitor them, compare them and report on them.

What a risk register contains

Field Purpose
Risk ID and title Gives each risk a unique reference and a clear name
Description States the cause, the event and the consequence
Category Groups risks, such as safety, environmental, operational or financial
Inherent rating Risk level before controls
Existing controls What is already in place
Residual rating Risk level after controls
Risk owner The named person accountable for managing the risk
Actions Further steps, with owners and due dates
Review date and status When the risk was last reviewed and whether it is open or closed

Risk assessment vs risk register

Item Risk assessment Risk register
What it is A process and its output for a task, area or activity A central log of risks across the organization
Focus Detailed analysis and controls Tracking, ownership and reporting
Updated When work or conditions change Continuously, at regular reviews
Used by Supervisors and EHS teams Managers, leaders and risk committees

How to keep a risk register useful

  • Name one accountable owner for each risk, not a department
  • Write risks in plain language that a manager can act on
  • Use the same rating scale as your risk assessments
  • Set review dates and follow them
  • Track actions to completion and escalate overdue items
  • Report the top risks to leadership on a regular schedule
  • Close or archive risks that no longer apply

Ownership is where many registers fail. A risk with no clear owner, or an owner who does not know they hold it, does not get managed. Ideagen's article on why risk register software gets risk ownership wrong looks at this problem in more detail.

Frequently asked questions

How often should a risk assessment be reviewed?

Review it on a set schedule, often once a year, and whenever work, equipment, people or the law change. Review it after any incident or near miss.

Who should carry out a risk assessment?

A competent person who understands the work. Involve the people who do the job and their representatives.

What is the difference between a risk assessment and a risk register?

A risk assessment evaluates the risks of a specific activity. A risk register records and tracks risks across the organization.

Is a risk assessment a legal requirement?

In many countries, yes, for employers. The detail varies by country and industry, so check the local rules.