This piece grew out of conversations between practitioners on Reddit, where new engineers keep asking how to build a process FMEA and a control plan from scratch for a prototype. We listen to what practitioners are talking about so we can share what is being discussed and add to it.

The aim here is to show how one document feeds the other. You will see a single PFMEA row turn into a control plan line, a column-by-column map between the two documents and a clear rule for when a similar product's FMEA can be reused and which ratings must be scored again. It is written for UK manufacturers.

What a process FMEA is and why it comes before the control plan

A process FMEA, or PFMEA, is a structured review of each step in a manufacturing process. For every step the team lists what could go wrong, what the effect would be, what could cause it and how it would be caught. FMEA stands for failure mode and effects analysis. A failure mode is the way a step could fail to deliver what it should.

FMEA is used before developing control plans for a new or modified process, and that is the order to follow, as set out in ASQ's FMEA guide. ASQ is a professional body, so its material is guidance and not a standard or a UK legal requirement. Customer contracts and sector rules may set formats and rating scales, so check them before fixing a template.

The control plan is the document that comes out of the analysis. It tells the shop floor what to measure, how, how often and what to do when a result is out of limits. The PFMEA says where the process can fail. The control plan says how the failure is prevented or caught.

What to have ready before starting the PFMEA

A prototype has little production history, so the quality of the analysis depends on the inputs. Gather the following before the first meeting.

  • A process flow diagram that lists every operation from receiving to dispatch.
  • The drawing, with tolerances and any characteristics the customer has marked as critical.
  • The rating scales for severity, occurrence and detection, agreed by the team and checked against any customer requirement.
  • A cross-functional team that includes design, manufacturing, quality and an operator who knows the equipment.
  • Data from the prototype build, such as trial measurements, scrap and rework, even if the sample is small.
  • Lessons from similar parts, including past complaints and nonconformances.

Turning one PFMEA row into one control plan line

Take a machined aluminium housing. The PFMEA row reads as follows. The step is boring the seal bore. The failure mode is bore diameter oversize. The effect is a leaking seal at the customer, rated severity 8. The cause is cutting tool wear, rated occurrence 5. The current control is an operator gauge check at the start of the shift, rated detection 6. Many teams use a scale of 1 to 10 for each rating, and some multiply the three into a risk priority number. Others use an action table instead. Follow whichever your company or customer specifies.

Choosing the characteristic and measurement method

The characteristic is the failure mode restated as something measurable: bore diameter, with its tolerance from the drawing. The severity rating of 8 marks it as a characteristic that needs close control. The measurement method should be able to resolve the tolerance, so an air gauge or bore gauge suits the seal bore better than a hand calliper. If the gauge is weak, the detection rating stays high and the risk stays open.

Setting sample size and frequency from the ratings

Frequency follows the ratings. A tool that wears at a moderate rate, with a poor check at the start of the shift only, is exposed for hours. The control plan line moves to a check of five consecutive parts every hour, plus a check after every tool change, with a tool life limit as a prevention control. A lower occurrence rating and a stronger detection method would justify a lighter sample. On a prototype, start tighter and relax the plan as capability data builds up.

Writing a reaction plan an operator can follow

The reaction plan says what happens when a result falls outside the limit. For the bore, it stops the machine, quarantines parts made since the last good check, replaces the tool, re-measures and tells the supervisor before restart. It names a person and a record to complete. A reaction plan that says only to inform quality will not be followed under pressure.

Inspection results and control plan data are easier to act on when they sit in one place. Ideagen's quality control software manages inspection and control plan data in one system, so a reaction plan triggers from the same record that holds the measurement.

Mapping PFMEA columns to control plan columns

Column names differ between companies and customer templates, but the flow of information is consistent. The table shows where each PFMEA column lands in the control plan.

PFMEA columnControl plan column it feedsHow the link works
Process step and functionProcess name or operation descriptionEach operation in the PFMEA becomes an operation in the control plan, in the same order as the process flow
Potential failure modeProduct or process characteristicThe failure mode is restated as something that can be measured, for example bore diameter oversize becomes bore diameter
Potential effect and severity ratingSpecial characteristic marking and reaction urgencyA high severity rating flags the characteristic for tighter control and a faster, stricter reaction
Potential cause and occurrence ratingProcess parameter to control and sample frequencyThe cause names what to monitor, such as tool wear or feed rate, and a high occurrence rating raises how often it is checked
Current prevention controlsControl methodPrevention controls, such as tool life limits or poka-yoke devices, are carried across as the method of control
Current detection controls and detection ratingMeasurement technique and sample sizeA weak detection rating prompts a better gauge, a larger sample or an added check
Recommended actions and responsibilityRevised controls and reaction plan ownerActions that are completed change the control plan, and the person responsible becomes the reaction plan owner

When reusing a similar product's FMEA is safe and what to re-score

Reuse is safe as a starting point, not as a finished analysis. A similar product's PFMEA is a sound base when the process, equipment, tooling, material and supplier are the same, and when a documented comparison shows no meaningful difference. Copy the structure and failure modes, then test every rating.

Severity needs re-scoring when the end use, the customer or the function of the feature differs, because the effect of the failure has changed. Occurrence needs re-scoring when the machine, tooling, material, volume or supplier differs. A rating borrowed from a mature process says nothing about a prototype with no capability data. Detection needs re-scoring when the gauge, fixture or inspection method differs.

Add any failure modes that the new design introduces, and remove only those that the team can show cannot occur. Record what was reused, what was changed and why, so a reviewer can follow the reasoning.

One analysis, one plan and a record of why they match

A new engineer can build a PFMEA control plan by working row by row: restate the failure mode as a characteristic, pick a method that can see the tolerance, set the sample from the occurrence and detection ratings and write a reaction plan that names who does what. Keep the two documents revised together, so an action completed in the PFMEA changes the control plan and a new failure on the floor changes both. To continue the discussion with other practitioners, join Ideagen's Reddit community.

Explore quality control solutions

Reduce non-conformance and automate your quality inspections for faster product development.